





1. Usage: Suitable for the agricultural, sideline products and other light products' transportation. The design is convenient for products' unloading, and it's not only satisfy the rated load also reduce the burden of the compartments.
2. Other Descriptions: The cargo's carring part of the stake truck is store house bar style designed, the beam wears through the longitudinal beam which is welded as a space frame structure, making the frame strength, stiffness, flexibility an equilibrium, a strong carrying capacity without permanent deformation.
3. Other Specifications: The max height of the rear guard from ground is 550mm, and the cross section is 180mmX70mm.
Product Specifications |
Model Number |
LAT9400CLXYE |
Rated Load |
50000 kg |
Tare Weight |
7000 kg |
Wheel Base |
6810+1310+1310,6510+1310+1310 (mm) |
Tyre Specifications |
1100R20-18/12R22.5-18 |
No. Of the Tyres |
12 |
Axle Brand |
FUWA (BPW optional) |
No. Of the Axles |
3 |
Axle-load |
24000 kg |
King Pin |
50#/90# |
Landing Leg |
28ton |
Pieces of leaf-spring |
10 (8) |
Suspension |
Independent stamping steel rigid suspension ( air suspension) |
Departure Angle |
13.4 |
Front/Rear Overhang |
2300 mm |
Outside Dimensions (LxWxH) |
13000X2500X4000, 3800,3600 3400,3200 (mm) |
Interior Dimensions (LxWxH) |
12800X2300X2600, 2400,2200 2000,1800 (mm) |
Material of the Main Beam |
Q345B manganese plates, automatic submerged arc welded |
Brake System |
Dual line braking system/ABS |
Brake Air Chamber |
Six double chamber |
Electrical |
24V 7 ways(7 wire harness) |
1)cutting
use the plasma cutting machine cut the steel to little parts use for suitable welding and splicing
2)welding
after steel cutting process the next step is welding .this process the main work is beam welding .the top plate-bottom plate and the
middle plate will be welding together . this process will be use submerged arc welding process.this type of welding is very
special .its exclusively used in I beam welding .after this welding process other parts of the trailer will be use different welding way
for different steel-argon arc welding-electric arc welding-manual welding-gas welding and so on
3)blasting
this process is use for the first step of surface cleanness-stress relief-derusting before paiting .
4)electrophoresis coating
this process use for more detail surface cleanness
5)epoxy zinc primer spray coating
this process is the lasting one before paiting .after this process the trailer an be paiting
6)assembly
after all the process we have mationed .the last procedure of the trailer is assembly.this process all the parts will be assemly .it including tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake system and so on
Customer Visit

Our Service
Our advantage:
1, we can do the designs according to the customers' requirements
2,we can offer you the high quality and reasonable price
3,we can offer your a good after-sell service
4,we have strong prefessinal design team
5,prompt delivery.small order is welcome
Detail process:
1. Send us inquiries on your desired product / mdel through our contact information.
2. We shall reply you within 12 hours.
3. Negotiations on your needed configuration.
4. Configuration on the tech data.
5. Sign contract.
6.30% down payment or LC issuing.
7. Production
8. Manufacturig process updated news.
9. Production completement.
10. Shipment
11. Custom Clearance
12. A/S service for 1 year.
Please contact us for more details
AOTONG TRAILER
QINGDAO JUYUAN INTERNATIONAL TRADING CO.,LTD
24hours online,waiting for your kind inquire.
Welcome to our factory,We will pick up you from the airport.